Photo Galleries - Before & After
« back to galleries
- (left) Before, (right) Restructure, new siding & paint

- (left) Before, (right) New posts, beam & stone wall repair

- (left) Before, (right) New windows, siding repair & paint

- (left) All new posts & sub-beam, (right) Four new doors & siding

- (left) Post failure, (right) Repair with bracket

- (left) Bottom of post rotting?, (right) New concrete bases

- (left) Wall fell in, (right) New concrete wall with Buttress

- (left) Beam rotted from roof leak, (right) Splice new section of Top Plate Beam

- (left) Beams broken @ lap joint, (right) New post & bolster does it

- (left) We are building a Horse Run In, (right) The Horses can’t wait

- (left) Tie beam ripped out of post, (right) pull with cable & repair with Bracket

- (left) Original “Cow killer” doors, (right) New slider barn doors

- (left) Restructuring for new door, (right) New siding & door
